1 |
Design,Supply,Erection,Testing and Commissioning of 25 KV A.C.Single Phase,50 HZ,Traction Overhead Equipments,Switching Stations Booster Transformer Stations including foundations,structures and all ancillary equipments for Shakoorbasti(Excl)-Rohtak (incl) section of Delhi Division of Northern Railway under RE Project,Ambla.Total RKMs-60/TKMs-145 |
Chief Electrical Engineer Central Organisation for Railway Electrification Allahabad. |
Northern Railway |
179.823 TKM |
2 |
Design,Supply,Erection,Testing & Commissioning of 25 KV OHE work of 4th line between Asoati and palwal including both the yards. |
Chief Electrical Engineer/CON, Northern Railway. |
Northern Railway |
30 TKM |
3 |
Provision of New 132 KV/25 KV Single Transformer Traction Sub-Station behind Bidhannagar Road/ SSP Near Chitpur Terminal Station in Sealdah Division of Eastern Railway. |
|
|
Additional Divisional Manager Eastern Railway, Sealdah.
|
|
Eastern Railway |
|
4 |
Design,Supply,Erection, Testing & Commissioning of 25 KV OHE for the work of Provision of 66/25 KV traction Sub Station at Parwanoo and 25 KV feeder line/SSP.
|
Chief Electrical Engineer/Const,Northern Railway, New Delhi. |
Northern Railway |
TSS |
5 |
25KV, 50 Hz, Single Phase AC, OHE & TSS Works in Singapur Road (Excl) - Damanjodi (Incl) Section, Gr 181 of Waltair Division of East Coast Railway under RE Project Bhubaneswar, Total 152 RKM/179 TKMs. |
Chief Electrical Engineer/CON, Eastern Railway, Fairly Place, Kolkata. |
|
Eastern Railway |
TSS |
6 |
Supply of OHE mast, Contact Wire, OHE Equipment & All Accessories necessary for 25 KV AC Traction Overhead Equipment System and Electrical Equipment for balance doubling work and All Accessories necessary for Construction of 25 KV Switching Station Post(SSP) at DZK station in connection with Doubling work between BYSA & DZK.
Erection,Testing and Commissioning of 25 KV AC Traction Overhead Equipment System for balance doubling work and 25 KV Switching Station Post(SSP) at DZK station in connection with construction of Railway Doubling work between BYSA & DZK.
|
Haldia Energy Limited |
Haldia Energy Limited |
1.3 TKM |
7 |
Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV a.c Single Phase Overhead Equipment, LT supply transformer & switching station at Khanyan & Bainchi in connection with construction 3rd line between Talandu(ExcL) and Bainchi(IncL) (Excluding removal of infringements required for opening of Engineering Siding from Talandu to Bainchi) in Howrah Division of Eastern Railway. |
Chief Electrical Engineer/CON, Fairly Place, Kolkata. |
Eastern Railway |
|
8 |
Design, Drawings, Supply, Erection, Testing & Commissioning of Electrification of Track Hooper Line, Engine Escape Line within Plant Area of Kolaghat Thermal Power Station of WBPDCL,WB. |
|
Group General Manager Rites Ltd, Kolkata. |
|
WBPDCL,RITES LTD. |
9.5 |
9 |
Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV a.c. Single Phase Overhead Equipments, LT supply transformer and switching station in connection with Doubling work from Dakshin Barasat to Laksmikantapur in SEALDAH Division of Eastern Railway |
Chief Electrical Engineer/CON, Eastern Railway,Kolkata. |
|
Eastern Railway |
|
10 |
Design, Supply, Erection, Testing, & Commissioning of 25 KV OHE for the work of: 1. Electrification of Development of coaching terminal facilities at Anand Vihar Ph.11 & Electric Loco Shed at Anand Vihar.2. Electrification of 3 Nos. Additional X-overs bet. UP GAL and 3rd & 4th line on Anand Vihar-SBB Section.3. Extension of existing Heavy Repair Shed in EMU Car Shed at Ghaziabad.4. Faridabad: Development of Freight Terminal at Faridabad.5. Construction of ROB at newly constructed Bye Pass Road near Sector 61 & 59 at kms. 1497/19-21 on Delhi-Palwal Section at Faridabad.6. Provision for Up-gradation of Washing Line No. 7 & 8 at New Delhi. |
Chief Electrical Engineer/Const,Northern Railway,New Delhi. |
|
Northern Railway |
14 TKM |
11 |
Design, Supply, Erection, Testing & Commissioning of 25 KV, AC, Single phase, 50 Hz, Traction Overhead Equipments, Switching Stations, Booster Transformer Stations and LT Supply transformer Stations in Krishnanagar (Excl)- Lalgola (Incl) section of Eastern Railway under RE project, Kolkata (128 RKMs/144 TKMs). |
Chief Electrical Engineer, Railway Electrification, Allahabad. |
Northern Railway |
147.768 TKM |
12 |
Supply, erection, testing & commissioning ,qf .25 KV OHE Tamluk - Kanthi section |
Chief Electrical
Engineer/CON, South Eastern Railway.
|
South Eastern Railway |
60.793 TKM |
13 |
Supply, Erection & Commissioning of 25 KV OHE over Kanthi-Digha Section |
Chief Electrical
Engineer/CON, South Eastern Railway.
|
South Eastern Railway |
39.995 TKM |
14 |
Design, Drawing, Supply, Erection, Testing & Commissiong of 25 KV AC, Single Phase, Overhead Equipment, Switching Station and LT Supply Transformer for electrification of double line between Kalinarayanpur-Badkulla & Baruipur-Dakshin Barasat in Sealdah Division of Eastern Railway. |
Chief Electrical Engineer/CON, Eastern Railway, Fairly Place, Kolkata |
Eastern Railway |
37.861 TKM |
15 |
Design, Supply, Erection,Testing & Commissioning of 25 KV OHE for the work Electrification of :-New line from CDG to Kharar |
Chief Electrical Engineer(Con), N.Rly. New Delhi. |
Northern Railway |
25.192 TKM |
16 |
Design, Supply, Erection, Testing & Commissioning of 25 KV OHE for the work of :- Electrification of 3rd line between Sahnewal-Ludhiana in connection with CDG-LDH new B.G. rail link. |
Chief Electrical Engineer(Con), N.Rly. New Delhi. |
Northern Railway |
21.765 TKM |
17 |
Design,Drawing,Supply,Erection,Testing and Commissioning of 25 KV a.c.Single Phase Overhead Equipments & LT Supply Transformer for Doubling Between Chandpara to Bongaon and Karea-Kadambagachi to Sondalia in Sealdah Division of Eastern Railway. |
Chief Electrical Engineer(Con), E.Rly, Fairly Place,Kolkata. |
Eastern Railway |
21.208 TKM |
18 |
Design, Drawing ,Supply, Erection ,Testing & Commissioning of 25 KV AC Single Phase Overhead equipment & switching station and LT supply transformer for Electrification of Double Line between Baruipur-Magrahat in Sealdah Division of Eastern Railway.” |
Chief Electrical Engineer(Con), E.Rly, Fairly Place, Kolkata. |
Eastern Railway |
19 TKM |
19 |
Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV AC Single phase OHE, Switching Station, LT Supply Transformer 7 Switching Station in connection with the work of Doubling from Ghutiari Shariff to Canning in Sealdah Division of Eastern Railway |
Chief Electrical Engineer/CON, Eastern Railway, Fairly Place, Kolkata.
|
Eastern Railway |
16.122 TKM |
20 |
Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV AC Single phase Overhead Equipment, Switching station and LT Supply Transformer for complete Electrification of Chitpur yard in Sealdah Division of Eastern Railway |
Chief Electrical
Engineer/Con Eastern
Railway, Fairly Place, Kolkata.
|
Eastern Railway |
14 TKM |
21 |
Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV a.c. Single Phase Overhead Equipment, LT supply transformer & modification of switching station etc. in connection with Doubling work from Bhagwangola to Jiaganj in SEALDAH Division of Eastern Railway |
Chief Electrical Engineer(Con), E.Rly, Fairly Place,Kolkata. |
Eastern Railway |
13.14 TKM |
22 |
Electrification of New BG line from Kharar to New Morinda including Mohali/SSP.Kharar/SP,New Morinda/FP and Kurali/TSS" |
Chief Electrical Engineer,Northern Railway Electrification,New Delhi. |
Northern Railway |
12.501 TKM |
23 |
Design, Supply, Erection, Testing & Commissioning of 25KV OHE for the work of "Development of Freight Terminal Facilities at Chandigarh |
Chief Electrical Engineer/Const,Northern Railway, New Delhi. |
Northern Railway |
2.132 TKM |
24 |
Design, Supply, Erection, Testing & Commissiong of 25 KV OHE work of upgradation of 2 Nos Traction Power Transformers of 21.6 MVA,66KV/27KV at Ballavgarh TSS. |
Chief Electrical Engineer(Con), N.Rly.New Delhi. |
Northern Railway |
TSS |
25 |
Design, Supply, Erection, Testing & Commissioning for the work of "Provision of 2nd 220/KV/27KV Power Transformer of 21.6 MVA capacity at Traction Sub Substation, Ghaggar |
Chief Electrical Engineer/Const,Northern Railway, New Delhi. |
Northern Railway |
TSS |
26 |
Design, drawing, supply, erection, testing and commissioning of 25 KV AC OHE and switching station in connection with construction of Railway infrastructure of DSTPS of DVC at Andal, Durgapur |
Group General Manager(P), RITES, Kolkata. |
RITES |
|
27 |
Design,Supply,Erection,Testing & Commissioning of 25 KV AC, 50 Hz Single phase, Traction Over head Equipments, Transformer Stations in Bharatpur Coliery siding at Talchar |
Chief Project Manager, Railway Electrification,Bhubaneshwar. |
Railway Electrification |
|
28 |
Electrification of double line between Kargi Road Yard - Salka road in Bilaspur Division |
Chief Electrical Engineer/Con, South Eastern Railway, Garden Reach, Kolkata. |
South Eastern Railway |
|
29 |
25 KV A.C., Single phase, 50 Hz, Traction Overhead Electrification Work in Khana(Excl.)- Sainthia-Pakur(Incl.), Gr.162-A of Eastern Railway, under Railway Electrification Project Kolkata; Total 152 RKM/376 TKM. |
|
Chief Administrative Office/Railway Electrification-Allahabad. |
Eastern Railway |
376 TKM |
30 |
132/25kV Traction Substation work at Rampurhat and Dubrajpur in Khana - Sainthia - Pakur and Pandabeswar - Sainthia SECTION (Group -162A&B). |
|
Chief Administrative Office/Railway Electrification -Allahabad. |
|
Eastern Railway |
2 Nos TSS Work |
31 |
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50 Hz, Single Phase, Electrification Works including OHE, TSS, SCADA & Electric General Works on Turnkey Basis in Vizianagaram (Excl.) – Singapur Road (Incl.) Gr.166 of Waltair Division of East Coast Railway under RE Project Bhubaneswar (Total 138.84 RKM / 369 TKMs) - BCPL-EMC JOINT VENTURE. |
Chief Administrative Office /Railway Electrification-Allahabad. |
|
East Coast Railway |
369 TKM including 3 nos Tss work |
|
32 |
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50 Hz, Single Phase Over Head Equipment including, TSS & SCADA Works in Kumedpur (Excl.) – Old Malda (Incl.) & Old Malda – Singhabad Section, Gr.171 of Katihar Division of North Frontier Railway under RE Project New Jalpaiguri, Total 79 RKM / 168 TKMs” - EMC-BCPL Joint Venture. |
|
Chief Administrative Office/Railway Electrification - Allahabad. |
North Frontier Railway |
168 TKM |